CONTAINER LOADING PROCEDURES ON SHIPS

Loading containers onto a ship is a complex task that requires careful planning and consideration of various factors such as position, weight, and cargo type to ensure safety and efficiency throughout the voyage. Below is an overview of this process.

1. Ship Cargo Hold Structure

Container ships are divided into bays, rows, and tiers to optimize space and ensure safety:

  • Bay: Numbered from the bow to the stern, starting with 01. Odd-numbered bays are typically for 20-foot containers, while even-numbered bays are for 40-foot containers.
  • Row: Numbered from the centerline of the ship outward. Odd numbers are on the starboard side, and even numbers are on the port side.
  • Tier: Refers to the vertical stacking of containers. Containers below deck start from tier 02 and increase by 2 per layer. Containers on deck start from tier 80 and also increase by 2 per layer.

2. Loading Restrictions and Regulations

Certain types of containers have specific loading requirements:

  • Reefer Containers: These require a continuous power supply to maintain the desired temperature. They should be placed near power sources to prevent spoilage of goods.
  • Dangerous Goods Containers: Must comply with the International Maritime Dangerous Goods (IMDG) Code and regulations of the destination port. They should be stowed in designated areas to prevent hazards to the vessel and other cargo.
  • Overweight or Oversized Containers: These cannot be stacked on top of other containers and require special stowage arrangements. They occupy more space and may require multiple slots both horizontally and vertically.

3. Loading and Unloading Procedures

Before loading, a manifest is provided by each shipping agent, detailing information about each container such as type, size, weight, and destination port. Containers are loaded in the following order:

  • Containers for the Final Port: Loaded first and placed at the bottom to facilitate unloading at the final destination.
  • Containers for Intermediate Ports: Loaded afterward and placed above the containers for the final port to avoid unloading them prematurely.

4. Benefits of Proper Stowage Planning

Effective stowage planning offers several advantages:

  • Space Optimization: Ensures efficient use of available space on the vessel.
  • Reduced Loading and Unloading Time: Streamlines the process, saving time and reducing costs.
  • Enhanced Safety: Prevents accidents and damage to cargo by ensuring proper placement and securing of containers.

If you require assistance with import or export logistics, please contact us for prompt and accurate support.